The operator changed. The facility stayed open. The money kept moving.

$452.9M to Amentum for Camp East Montana after ICE ended the first contract for its own convenience

A federal audit documented waste and standards failures at a 5,000-capacity El Paso detention camp. ICE terminated the Acquisition Logistics order for the government's convenience on April 17, 2026, GAO reports a different vendor began operating the next day, Amentum holds a sole-source award, and ICE has published a justification to extend it through September 2027 for up to $776 million more.

Current award
$452.9M
Award ID (PIID)
70CDCR26C00000016
Last verified
August 20, 2026
Open press frame — Money trail

Share with the sourcing attached

Post to Bluesky

Both copied strings carry the attribution language and the canonical link, and label the reported extension figure as reported potential value rather than obligated spending.

01

The receipt

Camp East Montana opened in August 2025 with capacity for about 5,000 people. GAO found ICE never conducted the required pre-occupancy inspection, calculated millions of dollars paid for services and meals that were not needed, and documented failures across medical care, safety, legal access, and death reporting. ICE terminated the earlier Acquisition Logistics order for the government's convenience on April 17, 2026, and GAO reports that a different vendor was contracted to begin operating the site on April 18. In March 2026 Amentum Services, Inc. received a noncompetitive award recorded at about $452.9 million. No reviewed record states that the audit caused the change, that the termination was for cause, or that Amentum succeeded to the earlier contract. In July 2026 the Associated Press reported, from a published ICE justification notice, that ICE plans to extend that no-bid contract through September 30, 2027 at a potential additional cost of $776 million.

Contract scope as written on the federal record: “THE PURPOSE OF THIS CONTRACT IS TO PROVIDE DETENTION, TRANSPORTATION AND MEDICAL SERVICES AT THE CAMP EAST MONTANA TEMPORARY DETENTION CENTER IN EL PASO, TX.”

01a

The figures, with what each one counts

  • Up to $11.5M

    Paid before anyone was housed

    GAO's calculation of waste for services invoiced from August 1 through August 15, 2025, before any detained noncitizens were housed at the facility.

    GAO finding, GAO-26-108886

    U.S. Government Accountability Office
  • $423K

    Meals not needed, Aug 16 – Sep 30 2025

    GAO's calculation of the cost of meals ICE did not need from August 16 through September 30, 2025.

    GAO finding, GAO-26-108886

    U.S. Government Accountability Office
  • $7.1M

    Meals not needed, Oct 1 2025 – Mar 12 2026

    GAO's calculation of the cost of meals ICE did not need from October 1, 2025 through March 12, 2026.

    GAO finding, GAO-26-108886

    U.S. Government Accountability Office
  • $452.9M

    Initial Amentum award

    Current and potential award value of $452,855,435.04 recorded on the federal contract record for PIID 70CDCR26C00000016.

    Federal contract record, USAspending.gov

    USAspending.gov
  • $776M

    Potential additional cost of the reported extension

    Potential additional cost of extending the contract through September 30, 2027, as reported by AP from ICE's published justification notice. This is a reported potential figure, not an obligation on the federal award record.

    Reported by AP from an ICE justification notice

    Associated Press
01b

Paid capacity versus people held

Printed contract floor against people heldEnd of February 2026
Meals paid for5,000
People held1,600

ICE data cited by GAO showed about 1,600 people held at the end of February 2026 while ICE continued paying full meal costs for 5,000. The capacity figure is the facility's stated capacity, not a population count.

U.S. Government Accountability Office
01c

What changed and what did not

What changed

  • The contractor of record changed: the initial facility contract was terminated for convenience and Amentum Services, Inc. was awarded PIID 70CDCR26C00000016.
  • The contracting vehicle changed: the replacement award is recorded as not competed, with one offer received.

What did not

  • The facility stayed open. Camp East Montana continued to operate as a detention site.
  • The detention function stayed the same: detention, transportation, and medical services at the same El Paso site.
  • The spending continued: $452,855,435.04 on the replacement award, with a reported justification to extend through September 30, 2027.

Replacing a contractor is not the same as remedying an audited condition. GAO's recommendations are shown as open.

01d

Follow the failure

  1. 2025

    Senior direction accelerated expansion

    GAO describes the facility as one of the detention sites stood up rapidly under the administration's detention expansion.

    GAO finding, GAO-26-108886

    U.S. Government Accountability Office
  2. 2025

    Army awarded the original facility contract

    The original Army-administered contract for the facility was approximately $1.3 billion.

    GAO finding, GAO-26-108886

    U.S. Government Accountability Office
  3. August 2025

    Facility opened without the required inspection

    Camp East Montana opened in August 2025 with capacity for about 5,000 detained noncitizens. GAO found ICE did not conduct the required pre-occupancy inspection.

    GAO finding, GAO-26-108886

    U.S. Government Accountability Office
  4. Through June 2026

    GAO documented waste and standards failures

    GAO calculated up to $11.5 million paid for services before anyone was housed, about $423,000 and about $7.1 million for meals that were not needed, and documented failures across medical care, safety, legal access, and death reporting.

    GAO finding, GAO-26-108886

    U.S. Government Accountability Office
  5. Before March 2026

    Initial contractor terminated for convenience

    The original facility contract was terminated for convenience. A termination for convenience is a government contracting action and is not itself a finding of contractor fault.

    GAO finding, GAO-26-108886

    U.S. Government Accountability Office
  6. March 2026

    Amentum received a sole-source bridge contract

    PIID 70CDCR26C00000016 was signed March 12, 2026 with a period of performance beginning March 13, 2026 and ending September 30, 2026, recorded at $452,855,435.04. The federal record lists the extent competed as NOT COMPETED, solicitation procedures as ONLY ONE SOURCE, and one offer received.

    Federal contract record, USAspending.gov

    USAspending.gov
  7. July 2026

    ICE published a justification for another year

    AP reported, from ICE's published justification notice, a plan to extend the no-bid contract through September 30, 2027 at a potential additional cost of $776 million, rejecting calls to close the facility.

    Reported by AP from an ICE justification notice

    Associated Press

Order of events only. Sequence does not establish causation.

01e

Audit findings, grouped and unscored

acquisition

  • The original Army-administered facility contract was approximately $1.3 billion.
  • Camp East Montana opened in August 2025 with capacity for about 5,000 detained noncitizens.
  • The initial contract was terminated for convenience and replaced by a noncompetitive award.
U.S. Government Accountability Office

wasted public money

  • Up to $11.5 million in waste calculated for services paid from August 1–15, 2025, before any detained noncitizens were housed there.
  • About $423,000 for meals not needed from August 16 through September 30, 2025.
  • About $7.1 million for meals not needed from October 1, 2025 through March 12, 2026.
  • ICE data cited by GAO showed about 1,600 people held at the end of February 2026 while ICE continued paying full meal costs for 5,000.
U.S. Government Accountability Office

medical care

  • Tuberculosis screening failures.
  • Missing chronic-care treatment plans.
U.S. Government Accountability Office

safety and security

  • Missing perimeter security cameras and blind spots.
  • A lost loaded firearm.
  • Unsanitary conditions.
  • Supervision failures.
  • Suicide-prevention failures.
  • Insufficient outdoor recreation.
  • Inadequate accessible facilities.
  • Food-service and transportation failures.
U.S. Government Accountability Office

legal access

  • Delayed attorney and family visitation.
  • Delayed law-library access.
U.S. Government Accountability Office

death reporting

  • Use-of-force and death reporting failures.
U.S. Government Accountability Office

oversight

  • ICE did not conduct the required pre-occupancy inspection.
  • GAO made four recommendations; their status is shown as open on the GAO product page.
U.S. Government Accountability Office

Findings are reproduced as grouped statements from the cited audit. They are not counted, weighted, or combined into any score or rating.

01f

The agency's stated position

ICE's stated justification for extending without competition

AP reported that ICE's published justification notice argued relocation or a contractor transition would be impracticable because of bed-space limits, proprietary infrastructure, the need for replacement staffing, duplicated costs, and continuity risks. This is the agency's stated position as reported, not a finding of this project.

Associated Press

Contractor comment status

AP reported that Amentum referred its questions to ICE and DHS. No company response to those questions is recorded here.

Associated Press

Calls for closure

AP reported that ICE rejected calls to close the facility.

Associated Press
01g

Recommendations on the record

  • The ICE Director should ensure that future detention facility acquisitions of this type incorporate cost-saving mechanisms, such as tiered pricing tied to actual population, so the government does not pay for unused capacity.

    Responsible: U.S. Immigration and Customs Enforcement, Department of Homeland Security · Status: open

    U.S. Government Accountability Office
  • The ICE Director should develop and implement controls ensuring that required pre-occupancy inspections are completed and documented before detained people are housed at a new facility.

    Responsible: U.S. Immigration and Customs Enforcement, Department of Homeland Security · Status: open

    U.S. Government Accountability Office
  • The Secretary of the Army should assess this acquisition and identify lessons learned for future interagency detention support work.

    Responsible: Department of the Army, Department of Defense · Status: open

    U.S. Government Accountability Office
  • The Secretary of Homeland Security should assess this acquisition and identify lessons learned for future detention capacity expansions carried out with other agencies.

    Responsible: Department of Homeland Security · Status: open

    U.S. Government Accountability Office
02

The chain

  1. 01

    Public money

    ICE custody operations

    Detention, transportation, and medical services at a temporary detention center, funded through ICE contracting.

    No source attached
  2. 02

    Award

    PIID 70CDCR26C00000016

    Signed March 12, 2026; period of performance March 13 through September 30, 2026; recorded as not competed with one offer received.

    No source attached
  3. 03

    Contractor

    AMENTUM SERVICES, INC.

    Named recipient on the federal award record; parent recipient listed as PAE Applied Technologies LLC.

    No source attached
  4. 04

    Facility

    Camp East Montana, El Paso, Texas

    Named in the award description and audited by GAO in GAO-26-108886.

    No source attached
  5. 05

    Evidence boundary

    Documented in the same detention system. Not presented as a causal attribution. The record below is documented alongside this funding chain, not asserted to be caused by it.

    Human cost

    Documented by other sources, not by this contract record

    GAO documents conditions and standards failures. Two deaths at this facility are recorded in the harm ledger; both occurred before this contract began, and this project attributes neither to this award.

    No source attached
03

Contract timeline

  1. August 1, 2025

    Step 01

    Facility opened

    Camp East Montana opened with capacity for about 5,000 detained noncitizens, without the required pre-occupancy inspection.

  2. February 28, 2026

    Step 02

    Occupancy versus meals paid

    ICE data cited by GAO showed about 1,600 people held while ICE continued paying full meal costs for 5,000.

  3. March 12, 2026

    Step 03

    Amentum award signed

    $452,855,435.04

    Date signed on the federal record. The period of performance start is recorded one day later, March 13, 2026; both values are reproduced as published.

  4. June 9, 2026

    Step 04

    GAO report published

    GAO-26-108886 published with four recommendations.

  5. July 27, 2026

    Step 05

    Extension reported

    AP reported ICE's published justification to extend through September 30, 2027 at a potential additional cost of $776 million.

  6. September 30, 2026

    Step 06

    Current period of performance ends

    End date on the federal award record as retrieved.

Period of performance: March 13, 2026 to September 30, 2026, with a potential end of September 30, 2026 if options are exercised.

03b

Award trajectory

How the obligation on this award moved, action by action, against the value ceilings the source reports.

Cumulative obligation on award 70CDCR26C00000016Reported obligation rises from $452.9M on Mar 12, 2026 to $452.9M on Mar 12, 2026 across 1 dated contract actions. Exact figures are in the table below.$0$200.0M$400.0MMar 12, 2026 — cumulative $452,855,435.04Mar 12, 2026Sep 30, 2026
  • Cumulative reported obligation
  • Current value (exercised options) — $452,855,435.04

Source: USAspending.gov award 70CDCR26C00000016, retrieved 2026-08-20. Unit: US dollars, nominal, not inflation-adjusted.

The line steps only on dates the source records. Cash outlay is reported as a single to-date total with no action-level dates, so it is drawn as one marker at the retrieval date and never as a line across time. Each action mark is keyboard focusable.

Contract actions as a table (1) — select a modification for its evidence trace
Every contract action reported for award 70CDCR26C00000016
Action dateModActionThis actionCumulative obligation
Mar 12, 2026DEFINITIVE CONTRACT$452,855,435.04$452,855,435.04
Award record on USAspending.gov
04

Contractor and facilities

Recipient

Amentum

AMENTUM SERVICES, INC.

Federal services contractor recorded on USAspending as the recipient of the March 2026 Camp East Montana award, with PAE Applied Technologies LLC listed as the parent recipient. Only the award records currently indexed here are totaled below; this is not the company's full federal portfolio.

Contractor profile

Facilities named in the award

  • Camp East Montana Temporary Detention Center

    El Paso, Texas · Temporary detention center (contracted services)

Facility index
04a

The facility record beside the money record

ERO El Paso Camp East Montana

Reviewed identity join · Contract detention facility

Reported average daily population
2,026.4
Reported average length of stay
11.5 days
Reported guaranteed minimum
5,000
Latest indexed oversight item
None indexed
Accountability dossier
Published
  • Observed harm records: 1
  • Attributed: 1
  • Allegations: 0

This award does not establish any condition, finding or harm listed here. Population and length-of-stay figures are fiscal-year aggregates as of the workbook pull, not counts on the award dates. ICE workbook data pull, 2026-07-20.

05

Evidence boundary

What the evidence establishes

  • A federal award of $452,855,435.04 to AMENTUM SERVICES, INC. exists with PIID 70CDCR26C00000016, signed March 12, 2026.
  • The federal record lists the extent competed as NOT COMPETED, solicitation procedures as ONLY ONE SOURCE, and one offer received.
  • Its stated scope is detention, transportation, and medical services at the Camp East Montana Temporary Detention Center in El Paso, Texas.
  • GAO calculated up to $11.5 million in waste for services paid August 1–15, 2025, about $423,000 for meals not needed August 16 – September 30, 2025, and about $7.1 million for meals not needed October 1, 2025 – March 12, 2026.
  • GAO found ICE did not conduct the required pre-occupancy inspection, and documented failures across medical care, safety and security, legal access, and death reporting.
  • AP reported, from ICE's published justification notice, a planned extension through September 30, 2027 at a potential additional cost of $776 million.

What it does not establish

  • That the $776 million extension has been obligated. It is a reported potential cost from a published justification notice, not a figure on the federal award record.
  • That Amentum is responsible for any condition GAO documented before its contract began on March 13, 2026.
  • That either death recorded at this facility was caused by, or is attributable to, Amentum, the March 2026 award, or the reported July 2026 extension.
  • That the waste GAO calculated was unlawful, fraudulent, or criminal. GAO calculated cost for services and meals that were not needed.
  • Why the award record shows $0.00 outlayed at retrieval. Outlay reporting lags invoicing.
  • Anything about the company's total federal revenue — only this award is represented here.
06

Human impact linkage

No harm record in this dataset is linked to this award at the contract level. Two deaths recorded at this facility are shown below as facility history only: both occurred before this contract began.

Facility history · no contract-level linkage

  • Geraldo Lunas Campos — January 3, 2026

    Camp East Montana · recorded as attributed

    The cause language is reproduced as an attributed source finding. This project does not independently diagnose the death or adjudicate negligence, preventability, or responsibility.

  • Victor Manuel Diaz — January 14, 2026

    Camp East Montana · recorded as attributed

    The cause language is reproduced as an attributed source finding. This project does not independently diagnose the death or adjudicate negligence, preventability, or responsibility.

These two records are shown because the cited source names Camp East Montana as the facility. Both deaths — January 3, 2026 and January 14, 2026 — occurred before Amentum's contract began on March 13, 2026. The facility connection is established. This project does not attribute either death to Amentum, to the March 2026 award, or to the reported July 2026 extension, and the categories and caveats recorded in the harm ledger are unchanged here.

How this project categorizes harm
07

Oversight and intervention windows

These records live in the central leverage ledger. A date passing never closes one; it flags it for review.

OpenAudit follow-up · Oversight effect

GAO recommendation 1 — cost-saving mechanisms in future acquisitions

Decision at issue

Whether ICE adopts a pricing mechanism that ties payment to the population actually held, including on the Camp East Montana contract.

Controls it
U.S. Immigration and Customs Enforcement, Department of Homeland Security
Office of the Director, ICE
Federal
Date · Estimated date
Estimated implementation horizon: by the end of 2026
An agency estimate, not a deadline. GAO reports that DHS stated in May 2026 it was shifting the Camp East Montana contract to tiered pricing and estimated doing so by the end of 2026. December 31, 2026 is this project's normalized sort boundary for that “by end of 2026” estimate, and no calendar file is offered for it.

Still unknown

  • The end-of-2026 figure is an agency estimate reported by GAO, not a compliance deadline. No source establishes a date by which ICE must act, and December 31, 2026 is only this project's normalized representation of that estimate.
  • Whether the tiered-pricing change has been executed is not established in the sources indexed here.
Observed · Last verified August 20, 2026U.S. Government Accountability OfficeOpen case
OpenAudit follow-up · Oversight effect

GAO recommendation 2 — controls for pre-occupancy inspections

Decision at issue

Whether ICE puts a documented control in place before the next facility of this type is occupied.

Controls it
U.S. Immigration and Customs Enforcement, Department of Homeland Security
Office of the Director, ICE
Federal
Date · Unknown date
No verified hard date
GAO recommendations do not carry a published compliance deadline. GAO-26-108886 was published June 9, 2026; that is a source publication date, not a deadline.

Still unknown

  • No implementation date is published for this recommendation.
  • Whether ICE has since issued any implementing control beyond the existing policy it cited is not established in the sources indexed here.
Observed · Last verified August 20, 2026U.S. Government Accountability OfficeOpen case
OpenAudit follow-up · Oversight effect

GAO recommendation 3 — Army assessment and lessons learned

Decision at issue

Whether the Army completes and documents an assessment of its role in this acquisition.

Controls it
Department of the Army, Department of Defense
Office of the Secretary of the Army
Federal
Date · Unknown date
No verified hard date
GAO recommendations do not carry a published compliance deadline. GAO-26-108886 was published June 9, 2026; that is a source publication date, not a deadline.

Still unknown

  • No implementation date is published for this recommendation.
  • Whether the Army has begun or completed the assessment is not established in the sources indexed here.
Observed · Last verified August 20, 2026U.S. Government Accountability OfficeOpen case
OpenAudit follow-up · Oversight effect

GAO recommendation 4 — DHS assessment and lessons learned

Decision at issue

Whether DHS completes and documents an assessment covering capacity expansions run with other agencies.

Controls it
Department of Homeland Security
Office of the Secretary of Homeland Security
Federal
Date · Unknown date
No verified hard date
GAO recommendations do not carry a published compliance deadline. GAO-26-108886 was published June 9, 2026; that is a source publication date, not a deadline.

Still unknown

  • No implementation date is published for this recommendation.
  • Whether the ICE and Office of the Chief Readiness Support Officer assessment has begun or concluded is not established in the sources indexed here.
Observed · Last verified August 20, 2026U.S. Government Accountability OfficeOpen case
uncertainOption exercise · Contract effect

Reported extension period would end September 30, 2027

Decision at issue

Whether the reported extension is executed, and on what terms, quantity, and price basis.

Controls it
U.S. Immigration and Customs Enforcement
ICE Office of Acquisition Management
Federal
Date · Estimated date
Reported period end: September 30, 2027
Reported extension period end, as described in AP's reporting on ICE's justification notice. It is not a verified decision deadline and this project does not present it as one.

Still unknown

  • Whether the reported extension has been executed is not established by the records indexed here.
  • The $776 million figure is an AP-reported potential extension value; no obligated amount for an extension appears on the award record read here.
Attributed · Last verified August 20, 2026Associated PressUSAspending.govOpen case
stale-needs-reviewContract renewal · Contract effect

Current period of performance ends September 30, 2026

Decision at issue

Whether ICE extends the noncompetitive award, recompetes the requirement, or ends it at the recorded period end.

Controls it
U.S. Immigration and Customs Enforcement
ICE Office of Acquisition Management
Federal
Date · Hard date
September 30, 2026
Period-of-performance end date on the federal award record for PIID 70CDCR26C00000016. It is a period end, not a published decision date, and no source establishes when ICE must decide.

Still unknown

  • The date by which ICE must decide is not established by any source indexed here.
  • Whether a modification has been signed after the August 20, 2026 review is not established here.
Observed · Last verified August 20, 2026USAspending.govAssociated PressOpen case

Institutional channels · not windows

Standing official routes. Each establishes only that the channel exists; none implies a request, complaint, hearing, or investigation, and none carries a status or a date.

  • Institutional channel · not a window

    ICE FOIA records channel

    U.S. Immigration and Customs Enforcement · ICE FOIA Office

    ICE operates a published FOIA request channel. Concretely requestable here: the justification for other than full and open competition behind the reported extension, contractor invoices for the period GAO audited, and the pre-occupancy inspection file GAO found missing.

    What this does not establish

    The official page establishes only that a request channel exists. It does not establish that any request has been filed, that a responsive record exists, that it is non-exempt, or that anything will be released.

    Open official page Verified August 20, 2026
  • Institutional channel · not a window

    DHS OIG complaint intake

    U.S. Department of Homeland Security · DHS Office of Inspector General

    DHS OIG publishes a hotline that accepts complaints concerning DHS programs, personnel, and contractors. GAO documented contract-performance and oversight failures at this facility in GAO-26-108886.

    What this does not establish

    The official page establishes only that DHS OIG accepts complaints. It does not establish that any complaint has been submitted, that a submission will be investigated, or that any OIG review of this facility, contract, or death exists.

    Open official page Verified August 20, 2026
  • Institutional channel · not a window

    House ICE oversight jurisdiction

    U.S. House of Representatives · Committee on Homeland Security, Subcommittee on Border Security and Enforcement

    The subcommittee's official page states oversight jurisdiction over U.S. Immigration and Customs Enforcement. That standing jurisdiction is the whole of what is established here.

    What this does not establish

    Standing jurisdiction only. No hearing, letter, inquiry, markup, or commitment to act on this facility, contract, or extension is established by this or any source indexed here.

    Open official page Verified August 20, 2026
08

Source docket

08b

How current this record is

Automated source retrieval

Award record watched
70CDCR26C00000016
Source last checked
2026-10-02 17:24 UTC
Last result
ok
Published data current through
2026-08-20

Retrieval runs on a schedule. Detected changes are queued for human review, not published automatically. A successful check means the source responded and validated; it does not mean the upstream record changed. Every figure on this page was verified against the cited source by a person. Source health

09

Provenance and corrections

Source snapshot
August 20, 2026
Parser state
automated parse manually reviewed
Claim status
verified against source