Skip to main content

Accountability dossier · partial

A researched record, still incomplete: the sections below carry what has been found and published so far, and say where work remains.

OCHOPEE, FL · Not established

South Florida Soft Sided Facility South

ICE's published operating figures for this facility, with the researched record set out below.

Closed

Why this site is carried here

A state-run immigration detention site at the Dade-Collier Training and Transition Airport, opened July 1, 2025 and announced closed June 25, 2026. Federal court filings, state contract reporting and federal grant records establish it. ICE's fiscal 2026 workbook prints no row for it, so this project holds no ICE population, length-of-stay, guaranteed-minimum or inspection figure for the site.

01

What the reviewed records establish

FY2026 average daily population
Not established

ICE's own fiscal-year average, not a bed count and not a point-in-time headcount.

Average of that population convicted or with pending charges
Not established

ICE's classification, reproduced as published. This is an ICE administrative classification. Pending charges are not convictions, and this field is not population-level crime-rate evidence.

Average length of stay
Not established
Guaranteed minimum
Not established

A population level a contract treats as guaranteed. The workbook prints the number, not the price.

Last inspection end
Not printed
Last final rating
Not printed

ICE workbook data pull, 2026-07-20

02

Money this project traces here

No award record in this dataset names this facility. ICE and its contractors may hold awards covering it that this project has not yet indexed.

A

Accountability dossier

Florida took a county-owned airstrip in the Everglades under emergency powers in June 2025, opened a tented detention site there on July 1, 2025, signed state contracts to build and run it, and applied to a federal grant program for the cost. The governor announced the site closed on June 25, 2026, and it was dismantled within weeks. ICE's detention workbook never printed a row for it, so none of the operating figures this project publishes for other facilities exist here.

Partial dossier · Last reviewed August 20, 2026

Published as partial: the lifecycle, litigation and public money are established from named records, but no operator, no vendor-level contract detail, and no ICE operating figure has been established for this site.

Evidence chain · every edge labelled by what the record establishes

01

Public money

  • Florida Division of Emergency Management — appropriated detention funding
  • U.S. Department of Homeland Security — appropriated detention funding

02

Award

  • Not established in sources currently indexed

03

Contractor / operator

    04

    Facility

    • South Florida Soft Sided Facility South

    05

    Findings

    • 11 published inspection, litigation, and harm records

    public money → award · Not established

    No federal award record currently indexed in this dataset names this facility.

    What this does not establish

    The award record does not establish how much has been paid out, nor that the appropriation was passed for this facility specifically.

    Harm records indexed here (observed / attributed)
    0 / 0

    Observed means an official record documents it. Attributed means a named source reached the finding. The two are never summed.

    Inspection and oversight records
    1
    Legal instrument, litigation and complaint records
    7

    These are counts of records indexed by this project, not counts of everything that happened. They are never summed into a score.

    B

    Who is involved, and on what basis

    • Federal agencyFlorida Division of Emergency Management

      June 24, 2025 — no end date printed

      The state emergency-management division is the agency ordered by a Florida court to produce the site's records, and the state entity whose grant application FEMA approved. Both roles are recorded in the cited sources.

      What this does not establish

      Which company physically operated the site, staffed it, or provided medical care. No operator contract has been read for this dossier.

    • Federal agencyU.S. Department of Homeland Security

      June 24, 2025 — no end date printed

      DHS signed plans for detention at the site in June 2025 and is a named defendant in the federal cases about it. The federal reimbursement ran through a DHS grant program.

      What this does not establish

      That the site was an ICE contract detention facility. No ICE detention award for this site has been located in the federal award records this project indexes.

    C

    Money, population, inspections, litigation and harm on one calendar

    The facility record beside the money record

    Lanes are shown side by side because they share a facility and a calendar, not a cause. Chronological proximity does not establish causation.

    Only dated events are plotted. Records carrying an as-of or dataset-cutoff date, such as ICE’s fiscal-year population aggregates, are listed in the table instead, because a data-pull date is not the date something happened.

    Facility evidence records by date, lane, evidence status and source.
    DateLaneRecordStatus
    Jun 24, 2025Litigation and corrective actionState takes the county airstrip under emergency powersUSA Today reported that the governor used state emergency powers to take control of the Dade-Collier Training and Transition Airport, owned by Miami-Dade County, to establish a detention site. Politico reported the same day that DHS had signed plans to hold up to 5,000 people there.USA TodayPoliticoAttributed finding
    Jun 27, 2025Litigation and corrective actionFriends of the Everglades v. Noem filedEnvironmental organisations sued federal and state officials over the site three days after the land was taken. The docket shows the case still active in August 2026.CourtListener / U.S. District Court for the Southern District of FloridaObserved / verified
    Jul 01, 2025Population and capacitySite opens and begins holding peopleThe site opened on July 1, 2025, one week after the state took the land. It held people for just under a year.WPTVAssociated PressAttributed finding
    Jul 01, 2025Litigation and corrective actionAccess-to-counsel claims brought by people held at the siteA complaint filed in the Southern District of Florida alleged that people held at the site were denied access to lawyers. A parallel case in the Middle District of Florida sought class certification on First Amendment attorney-access claims; that court's order is the source naming the site's official designation.American Civil Liberties UnionU.S. District Court for the Middle District of FloridaAllegation
    Jul 03, 2025Inspections and oversightState legislators refused entry, then given a tourState legislators who went to the site on July 3, 2025 were refused entry. Nine days later, on July 12, legislators were allowed in and said afterwards that people were held in cages.CNNCNNAttributed finding
    Jul 22, 2025Observed and attributed harmAccounts of food, sanitation and insect conditionsNBC News reported accounts from people held at the site and their relatives describing fungus, mosquitoes and insufficient food. These are accounts gathered by a named outlet.NBC NewsAllegation
    Aug 07, 2025Observed and attributed harmClaimed death at the site, denied by DHSRelatives and rights groups said a Venezuelan man had died at the site. DHS denied that the death occurred. This project has found no record establishing either the death or its absence, and carries the claim as disputed rather than as a death record.VenezuelanalysisDisputed
    Aug 12, 2025Observed and attributed harmAttorney alleges respiratory illness spreading at the siteAn attorney told The Guardian that a respiratory illness, possibly Covid-19, was spreading at the site. No test data or agency confirmation is cited in the report.The GuardianAllegation
    Aug 21, 2025Litigation and corrective actionDistrict court orders expansion halted and operations wound downThe district court granted a preliminary injunction stopping further expansion of the site and directing that operations wind down. A senior state official wrote days later that the site would likely be empty within days.U.S. District Court for the Southern District of Florida (via Earthjustice)Associated PressObserved / verified
    Sep 04, 2025Litigation and corrective actionEleventh Circuit stays the injunctionThe appeals court stayed the preliminary injunction while the appeal proceeded, allowing the site to continue operating.U.S. Court of Appeals for the Eleventh Circuit (via Courthouse News Service)Observed / verified
    Oct 03, 2025Money and award actionsFEMA approves Florida's $608 million reimbursement applicationFederal officials approved Florida's application for a $608 million grant covering costs of building and running the site. Approval is a decision on an application; it is not a payment.Associated PressAttributed finding
    Jan 22, 2026Litigation and corrective actionCourts order the state to release records about the siteCounsel for the environmental plaintiffs reported a court order requiring the Florida Division of Emergency Management to comply with public-records requests about the site. Further records claims were filed in August 2026 alleging the state withheld records about federal funding.EarthjusticeNaples Daily NewsAttributed finding
    May 15, 2026Money and award actionsFirst federal payment of $58,292,145 acceptedFlorida Phoenix quoted federal correspondence stating that a payment request of $58,292,145 had been approved and was accepted by the payment system on May 15, 2026. The state said two weeks later that the money had been received.Florida PhoenixFlorida PhoenixAttributed finding
    Jun 25, 2026Litigation and corrective actionGovernor announces closure; site dismantled; county regains the landOn June 25, 2026 the governor said the site held no one and had 'fulfilled' its role. Aerial reporting on July 15, 2026 showed the structures gone. On August 17, 2026 it was reported that Miami-Dade County had regained control of the land.WPTVAssociated PressWPTVTCPalmAttributed finding
    As of Jun 25, 2026Population and capacityMore than 6,700 people held over the site's lifetimeNBC6 Miami reported an analysis of released records covering more than 6,700 people held at the site since it opened. This is a cumulative throughput figure across the site's whole operating life.NBC6 MiamiAttributed finding
    As of Jul 20, 2025Money and award actions$245 million in state contracts signed for the siteThe Associated Press reported that Florida signed about $245 million in contracts to build and run the site, read from the state's own contract-reporting system. The money moved as state contracts, not as an ICE detention award.Associated PressAttributed finding
    D

    Inspections, findings and litigation

    An ICE compliance rating records the agency's own determination against its detention standards on the inspection dates. It does not establish that no harm or deficiency occurred.

    June 24, 2025 · Litigation and corrective actionAttributed finding

    State takes the county airstrip under emergency powers

    USA Today reported that the governor used state emergency powers to take control of the Dade-Collier Training and Transition Airport, owned by Miami-Dade County, to establish a detention site. Politico reported the same day that DHS had signed plans to hold up to 5,000 people there.

    Linked to this facility by
    Both reports name the Dade-Collier airport in Ochopee, the location this dossier covers.

    What this does not establish

    A capacity. The 5,000 figure is a plan reported by a news outlet, not a bed count, a population, or a contracted minimum.

    June 27, 2025 · Litigation and corrective actionObserved / verified

    Friends of the Everglades v. Noem filed

    Environmental organisations sued federal and state officials over the site three days after the land was taken. The docket shows the case still active in August 2026.

    Locator
    No. 1:25-cv-22896 (S.D. Fla.)
    Procedural status
    Active; docket activity recorded through August 14, 2026
    Linked to this facility by
    The case caption and pleadings concern this site.

    What this does not establish

    Any merits outcome. A filed case establishes claims made, not claims proven.

    July 1, 2025 · Litigation and corrective actionAllegation

    Access-to-counsel claims brought by people held at the site

    A complaint filed in the Southern District of Florida alleged that people held at the site were denied access to lawyers. A parallel case in the Middle District of Florida sought class certification on First Amendment attorney-access claims; that court's order is the source naming the site's official designation.

    Locator
    No. 1:25-cv-23182 (S.D. Fla.); No. 2:25-cv-747 (M.D. Fla.)
    Procedural status
    Allegation stage in the sources retrieved
    Linked to this facility by
    Both cases concern people held at this site.

    What this does not establish

    That access to counsel was in fact denied. These are pleaded allegations; no merits finding has been read for this dossier.

    July 3, 2025 · Inspections and oversightAttributed finding

    State legislators refused entry, then given a tour

    State legislators who went to the site on July 3, 2025 were refused entry. Nine days later, on July 12, legislators were allowed in and said afterwards that people were held in cages.

    Linked to this facility by
    Both visits were to this site.

    What this does not establish

    An inspection finding. A legislative visit is not an inspection against detention standards, and legislators' descriptions are their own accounts.

    August 21, 2025 · Litigation and corrective actionObserved / verified

    District court orders expansion halted and operations wound down

    The district court granted a preliminary injunction stopping further expansion of the site and directing that operations wind down. A senior state official wrote days later that the site would likely be empty within days.

    Locator
    Omnibus Order, No. 1:25-cv-22896 (S.D. Fla.)
    Procedural status
    Stayed on appeal, September 4, 2025
    Linked to this facility by
    The order is directed at operations at this site.

    What this does not establish

    That the site emptied. The order was stayed on appeal two weeks later, and the site kept operating.

    September 4, 2025 · Litigation and corrective actionObserved / verified

    Eleventh Circuit stays the injunction

    The appeals court stayed the preliminary injunction while the appeal proceeded, allowing the site to continue operating.

    Locator
    No. 25-12873 (11th Cir.)
    Procedural status
    Stay granted
    Linked to this facility by
    The appeal arises from the injunction against this site.

    What this does not establish

    Any view on the merits. A stay decides who bears the burden while an appeal is pending.

    January 22, 2026 · Litigation and corrective actionAttributed finding

    Courts order the state to release records about the site

    Counsel for the environmental plaintiffs reported a court order requiring the Florida Division of Emergency Management to comply with public-records requests about the site. Further records claims were filed in August 2026 alleging the state withheld records about federal funding.

    Procedural status
    Records claims pending as of the August 2026 reporting
    Linked to this facility by
    The records sought are the state's records of this site.

    What this does not establish

    That records were in fact withheld improperly. The August 2026 filing states claims, not findings.

    June 25, 2026 · Litigation and corrective actionAttributed finding

    Governor announces closure; site dismantled; county regains the land

    On June 25, 2026 the governor said the site held no one and had 'fulfilled' its role. Aerial reporting on July 15, 2026 showed the structures gone. On August 17, 2026 it was reported that Miami-Dade County had regained control of the land.

    Linked to this facility by
    All four reports concern this site and its airport location.

    What this does not establish

    The date of any legal transfer of the land back to the county, or that the state's detention operations ended everywhere. The August 2026 report establishes when the hand-back was reported, not when an instrument was executed.

    E

    Harm recorded in the sources indexed here

    July 22, 2025 · Observed and attributed harmAllegation

    Accounts of food, sanitation and insect conditions

    NBC News reported accounts from people held at the site and their relatives describing fungus, mosquitoes and insufficient food. These are accounts gathered by a named outlet.

    Procedural status
    Asserted in sworn filings and news accounts; contested by state and federal officials; not adjudicated
    Linked to this facility by
    The accounts are from people held at this site.

    What this does not establish

    That conditions were as described. These are attributed accounts; the record establishes no agency or court finding on these conditions, and none has been read for this dossier.

    August 7, 2025 · Observed and attributed harmDisputed

    Claimed death at the site, denied by DHS

    Relatives and rights groups said a Venezuelan man had died at the site. DHS denied that the death occurred. This project has found no record establishing either the death or its absence, and carries the claim as disputed rather than as a death record.

    Procedural status
    Contested: asserted by relatives and advocacy groups, denied by DHS
    Linked to this facility by
    The claim and the denial both concern this site.

    What this does not establish

    That anyone died at this site. The record establishes no death and attributes none; it is not counted in any harm total here and never will be unless identity, date and custody relationship are documented.

    August 12, 2025 · Observed and attributed harmAllegation

    Attorney alleges respiratory illness spreading at the site

    An attorney told The Guardian that a respiratory illness, possibly Covid-19, was spreading at the site. No test data or agency confirmation is cited in the report.

    Procedural status
    Asserted by an attorney for people held at the site; not adjudicated and not confirmed by any agency record indexed here
    Linked to this facility by
    The attorney's account concerns clients held at this site.

    What this does not establish

    An outbreak. This is an attributed account; the record establishes no confirmed case count for the site in the sources indexed here.

    F

    What this dossier does and does not establish

    Establishes

    • Florida took control of a county-owned airstrip in the Everglades under emergency powers on June 24, 2025, and a detention site opened there on July 1, 2025.
    • About $245 million in state contracts were signed for the site, and FEMA approved Florida's $608 million reimbursement application on October 3, 2025.
    • A first federal payment of $58,292,145 was accepted for payment on May 15, 2026.
    • A federal court enjoined expansion and ordered a wind-down on August 21, 2025; the Eleventh Circuit stayed that order on September 4, 2025.
    • The governor announced on June 25, 2026 that the site held no one, and it was reported dismantled by July 15, 2026.

    What this does not establish

    • Any average daily population, length of stay, guaranteed minimum or inspection rating. ICE's workbook prints no row for this site, so this project holds none of those figures.
    • Which companies operated, staffed or provided medical care at the site. Vendor-level contract records have not been read for this dossier.
    • That anyone died here. The one death claim found is denied by DHS and is carried as disputed, not as a death record.
    • That the reported conditions occurred. They are accounts and pleadings, not inspection findings.
    • That the full $608 million was paid. Only the May 2026 tranche is established as disbursed.

    Reviewed name matches

    • Alligator Alcatraz — The federal court order in H.C.R. v. Mullin names the site as the "South Florida Soft Sided Facility South ('SFSSFS')—also known as 'Alligator Alcatraz'".
    • Dade-Collier Training and Transition Airport site — Reporting on the June 2025 emergency-powers action and on the closure identifies the same county-owned airport in Ochopee, Collier County, as the location.
    G

    Open research questions

    These are the gaps the reviewed record set names. A question listed here is unanswered, not answered in the facility's favour, and this list does not claim to cover everything unknown about the facility.

    1. No row in ICE's fiscal 2026 detention workbook

      Searched — nothing released

      Every facility row in ICE's published fiscal 2026 workbook was searched for this site by name, city and address. There is none. The workbook prints only facilities holding at least one person at the data pull and excludes hold rooms, hospitals, juvenile placements and ORR sites, so a site that had closed before the pull would not appear. Locator: Facilities FY26 sheet, all rows.

      Collection searched · August 20, 2026 · not an event date

      What this does not establish

      That no one was held here, or that ICE had no involvement. Absence from one extract is absence from that extract.

    2. No federal detention award located for this site

      Searched — nothing released

      The federal award records this project indexes were searched for an award naming this site as a place of performance. None was found. Reporting describes the money as state contracts reimbursed through a federal grant programme rather than as an ICE detention contract. Locator: Award ledger held by this project.

      Collection searched · August 20, 2026 · not an event date

      What this does not establish

      That no federal award touching this site exists. It establishes only that this project holds none.

    3. No inspector-general or detention-standards inspection report found

      Searched — nothing released

      No DHS Office of Inspector General report, ICE Office of Detention Oversight inspection, or Government Accountability Office review of this site was located. Locator: Searches of the published DHS OIG and ICE inspection libraries.

      Collection searched · August 20, 2026 · not an event date

      What this does not establish

      That no review took place or that conditions met any standard. It establishes that no such published report was found.

    4. Vendor-by-vendor contract amounts and dates from Florida's contract-reporting system have not been read directly; reporting notes that detailed records for this site were replaced with summaries in that system.

      Open — no search recorded

      Dossier last reviewed · August 20, 2026 · not an event date

    5. The single-day peak population and any daily census for the site have not been obtained.

      Open — no search recorded

      Dossier last reviewed · August 20, 2026 · not an event date

    6. The remaining balance of the approved federal grant, and whether further tranches were paid, is unresolved.

      Open — no search recorded

      Dossier last reviewed · August 20, 2026 · not an event date

    7. The merits outcome of the environmental case after the September 2025 stay is unresolved.

      Open — no search recorded

      Dossier last reviewed · August 20, 2026 · not an event date

    8. The date Miami-Dade County legally regained the land, as distinct from the date it was reported, is unresolved.

      Open — no search recorded

      Dossier last reviewed · August 20, 2026 · not an event date

    H

    Dossier sources

    05

    Award and harm sources